The pill making machine is a new generation of pilling equipment developed by the factory for each company to produce different pills such as Xiaomi Pills, Water Pills and Concentrated Pellets. The machine has stable performance and convenient operation and maintenance. The other parts in contact with the drug are made of stainless steel material, which meets the requirements of GMP standards. When producing pills of different sizes and sizes, the size of the nozzle can be replaced with a different size knife.
The device has power control, simple operation and convenient movement. Ensure the necessary pressure for pelleting; press cake, purlin, and pill are completed, the pill rate is up to 95%; precision alloy steel with toothed roller, in line with hygienic conditions, and the technology of the reverse grinding round shaft guarantees the pill Smooth features.
Here's how to disassemble and install the device:
Disassembly installation
1. After the special retracting nut and the knife are tightened, the pill knife can be retracted from the top wire of the knife nut to retreat the pill.
2. Spring loading and unloading method and orientation:
Remove the pelletizer and use the mover to clamp the cutter shaft. The front thread on the right side of the cutter shaft is right-handed on the right side, and the left side is left-hand thread. After removing the bolt on the flange of the cutter shaft, unscrew the cutter shaft, and then hold the cutter axially forward, then pull out the flange seat, the gear body cutter shaft and the spring once, and remove the flange seat and gear body direction. Replaceable spring (left-handed spring on the left and right-handed spring on the right).
3. Guide key removal method and orientation:
After the flange seat is removed, the compression spring pushes the gear body forward by 10 mm and takes out the guide key. Do not exit with the gear body to avoid the guide key being caught in the undercut of the square groove of the cutter shaft.
Instructions for use
1. This machine is suitable for indoor environment temperature -5 °C to +40 °C, relative humidity less than 90%, grid voltage amplitude fluctuation <10% rated value, no conductive dust and corrosive metal gas indoors. Installed in a sunny and clean place in the factory, you can use the feet, padding, and must be grounded for safety.
2. Before driving, you must check whether the oil level of the gearbox reaches the standard position; check whether the oil cup on the hopper is filled with cooking oil; check whether the pilling machine is aligned and tightened; whether the wine clearing system is unblocked and adjust the appropriate amount. The guide wheel, the guide frame, the pelletizing knife, etc. are used for disinfection treatment with alcohol. Turn on electric heating.
3, the part of the strip is 3-5 minutes of empty operation, no abnormality can be fed, and the strip is pushed out. Return to the part of the hopper, and then open the pellet part after the material is qualified. The feeding should be uniform during the operation. If it is found that the stripping and the pelleting are not synchronized, the knob can be adjusted, the clockwise pelleting is fast, and the counterclockwise pelleting is slow. The size of the pill can be achieved by changing the different outlets and the pelletizing knife and the guide wheel.
4. Do not put foreign matter into the hopper when feeding, do not put your hand into the upper plane of the hopper, so as not to crush the hand. Always check the parts of the machine for any abnormalities and find that the abnormality stops immediately.
5. After use, turn off the main switch and other switches after power off. When removing the strip outlet, the electric heating cover, and the unloading head, you can use a hook-shaped handle (dedicated) and then pull out the bracket and the pusher. Disassemble the upper part of the hopper and clean the two flap shafts. After washing, apply oil. When used again, use alcohol to degrease all parts.
6. The oil in the reducer should be kept on the no oil mark. For normal work, the waste oil should be drained for two to five months, and the new oil should be replaced. The oil cup on the hopper adds cooking oil three times per shift, and the other gear sprocket points are added with appropriate amount of oil.
The above is all the content that is brought to you today. Through the sharing of the above small series, have you learned the correct installation steps of the pelleting machine ? I also hope that this article can help everyone.